House Project Week 34

 This week more lights were all set to go, floor transitions installed, more prep work got done and cleanup is underway as well. 

 Lights Under The Cabinets In The Kitchen



These Lights are very bright and Mom likes them better than the lights in the kitchen in the other house. These all turn on with just 1 switch. 

Dining Room Table Lights


The Dining Room Table Lights are working now. The dining room table which will go under the lights here will be a round table. 

Floor Transitions


The floor transitions were installed as well. We only needed three of them, 2 for the bathrooms (1 for each one) and one for the laundry room. 

Address Sign
The address sign is up now and it's correct, the missing 1 is there. 

Front Stair Handrail

The front stair handrail was installed and painted. 

Garage Lights
Just a temporary light, testing to make sure that the power works. 

The outside garage lights work now. 

The light by the people garage door, 

The two garages with the lights on. The outside lights are the same for both garages and new house. 

Cleanup 

Cleanup has started in the house as well. The living floor and island were a big mess. Exciting news to share as well.


This Week: Getting closer to finishing the house. Sounds like we can start moving in soon. Maybe next weekend. Depends how much gets done this next week or the move in the week after that. We are now spiriting to the finish line. 