House Project Week 23
This week the trim was painted, all the interior doors and closet doors were painted (hardware was installed) and reinstalled, microwave was installed.
Monday-Wednesday (Took pictures on Wednesday after we came back from our trip)
Door hardware was installed
Trim was painted around each of the doors
Trim in hallway was painted.
Interior doors were taken down and painted
Trim in secondary bathroom was painted.
These two images show the trim in secondary bedroom was painted.
Closet door was painted
Front door/living room trim painted.
Trim around window in living room and closet door painted.
More interior doors painted
Last two images show the kichen really coming together
Thursday
Closet door by front door was reinstalled and hardware installed.
Microwave was installed.
Trim around window in kitchen was painted.
Door hardware on interior doors inside of the house installed
Closet doors reinstalled and hardware installed.
Door hardware
These 3 images show how the master bedroom will look with all the painting, windows and floor all done.
Friday
These Friday images show how the house will look now with all the floors, windows, trim and kitchen appliances all installed.
This Week: Things will be a bit quiet until the power gets turned on late January. Maybe some odd and end kind of stuff will get done.