House Project Week 20
This week the floor was completed, the cabinets and island were installed, electrical work was started, and part of the driveway was poured.
Saturday
Here is the island in the kitchen, it was installed before the floor was installed. Easier to install it when the island is in place.
The secondary bedroom floor is done.
Monday
The floor was completed in the kitchen, living room and dining room, plus cabinets were started to get installed.
Tuesday
Wednesday
Electrical work was started.
Outlets were getting installed as well.
Vent was installed in the laundry room.
Light by side door to garage.
2 lights by garage door. Similar to the new garage that was built last year.
Here is a picture of the garage for a reference.
Thursday
Friday
First 7 images show our street packed with vehicles because they were pouring part of the driveway.
smoke detector was installed.
Bathroom cabinet is all done.
Vent was installed in the secondary bedroom.
Next 3 images show the driveway that was poured. This is by the garage and connects to the main road and the garage of the new house. More will be poured at a later date.
Island is all set to go.
Other Bathroom cabinet is good to go.
Bonus
New kitchen lights in the main house. These placed the one that got broken when the cabinets were installed last year. These lights will also go above the island in the new house.
New lights above the ceiling in the master house in the kitchen.
This Week: Continue work on the electrical and get the countertops installed.