House Project Week 18
This week painting was completed, the front stairs were built, garage door was installed and work on the floor was started.
The front stairs were started to get built.Saturday
Monday
Tuesday
More painting was done, some of the trim wasn't done and some mistakes were fixed. The front porch had the wrong color.
I was finally able to go inside and take a look around. All the walls are painted.
Here is the flooring for the house.
Wednesday
Friday
The crawl space door was installed.
This Week: Continue work on the floor, electrical will be turned on this week (we will finally have power inside the house) and maybe start work on the gutters.