House Project Week 18

  This week painting was completed, the front stairs were built, garage door was installed and work on the floor was started. 

                                                                      Saturday 

The front stairs were started to get built. 

Monday

The front stairs were completed. Hand railing to be built at some point. 
   Tuesday







More painting was done, some of the trim wasn't done and some mistakes were fixed. The front porch had the wrong color. 








I was finally able to go inside and take a look around. All the walls are painted. 

Here is the flooring for the house.

Wednesday
The garage door was delivered and installed. 

Thursday
View from the front porch by the front door, looking towards the neighbor's yard. 

Friday
The crawl space door was installed.

The flooring was started. First time I entered the house through the front door. 



This Week: Continue work on the floor, electrical will be turned on this week (we will finally have power inside the house) and maybe start work on the gutters. 