House Project Week 14

 This week the house was wrapped with siding wrap, the trim and siding were delivered, and the dry board was delivered and installed. 

                                                                      Monday









This is what goes between the plywood and the siding. It helps to protect the house from rain (water)

Wednesday



The dry board was delivered and was left in each of the bigger rooms and the hallway. 

Gravel was also delivered. 





The gravel was placed under the deck so that weeds cannot grow under the deck. 

A New hose faucet was installed as well.


The entrance to the crawl space was fixed the other entrance was the wrong size. 

Thursday

First two images garage. With door leading to a staircase that leads into the house. 

Stairs going from garage to house (hallway)

Master Bedroom

Master Bedroom

Master Bedroom Bathroom
Master Bedroom Bathroom and Closet

Secondary Bedroom

Secondary Bedroom Closet 

Laundry Room 

Living Room 

Living Room Closet and Front Door

Kitchen

Dining Room 

Ceiling 
The dry board was installed, and you can really see how the rooms will look. You can now see some closets taking shape as well. 

Trim and siding was also delivered. 

This Week: Hopefully get the siding and the trim started and maybe get more work on the dry wall as well. 