House Project Week 13
This week the Windows were installed; insulation was installed, and two out of three doors were put in place.
Monday
Two more doors were delivered.
Tuesday
Windows/Sliding Glass Door Outside View
Temporary stairs were built, makes it easier to get up and down from the
garage to the house.
The doors were put in the correct positions. One is the front door, one is the side garage door and the other is the door in between the garage and house.
Thursday
Side garage door inside view.
Side garage door outside view.
Front Door outside view.
front door inside view.
Two out of the three doors were installed, the front door and the side garage door. Friday
This Week: Today: prep work on the siding, getting the wrapping up that goes between the plyboards and the siding. Hopefully get the siding installed this week.