House Project Week 10
This week the bathtub was delivered; the garage floor was completed, and the front and back porches were started.
Monday
The rebab was set in place for when the concrete will be poured.
Tuesday
As you can see a lot of wiring was set it place.
Living Room.
Living/Dining Room
Kitchen (the sink will be where the white pipe that is low to the ground)
Kitchen (Fridge will be in this area)
Laundry Room
Bedroom
Bathroom
Bathroom
Closet
Bedroom
Hallway
The last three images the black boxes you see on the ceiling will be lights.
Wednesday
The Concrete was poured.
Thursday
The Electrical Panel was installed.
The bathtub was delivered. It's in the dark gray box.
This is where the Electrical Panel will be, you can see all the wiring coming out of it.
Friday
The small white disk indicates where the toilet will go.
Back Porch coming from the dining room. There will be a stair leading down to the ground.
Front porch. This is how you will enter the house from the outside.
Kitchen, one outlet with the prongs installed. You can see the word Fridge. (this is where the fridge is going).
Electrical Panel in the garage.
Front Porch leading into living room.
Front porch will be similar to the front porch of our house.
Back Porch that will lead into dining room.
White line indicates where the end of the driveway will be (There will be a gravel path leading up to the front porch).