House Project Week 10

Image
  This week the bathtub was delivered; the garage floor was completed, and the front and back porches were started.                                                                    Monday The rebab was set in place for when the concrete will be poured.                                                                                                 Tuesday                     ...

House Project Week 9

Image
  This week the electrical, duct work and garage floor work was continued this past week.                                                                    Tuesday The big black pipes you see up above are ducts.     Wednesday  These two pieces of word indicate where the concrete floor of the garage will end.  Thursday The Electricians installed outlets (which are black and lower to the ground) and boxes (which are gray and round up on top) are where the lights will go.  Friday The electricals installed more outlets in the garage and installed lightswitchs which are blue and more in the middle of the wall.                    ...